PLANNING COMMISSION
Minutes of the
September 13, 2004 Meeting
Meeting #807 of the Hanover Township Northampton County
Planning Commission was held at the
Planning Commission members in attendance:
Paul Kuehne Karen Fritz
John McGonigle Glenn Taggart
George Scoggin
Hanover Engineering, Associates, Inc. represented by Charles
M. Schmalzer, P.L.S.
Motion was made by McGonigle,
seconded by Taggart, approving the minutes of the
McGonigle, yes Taggart, yes Fritz,
abstain Scoggin, abstain Kuehne, yes
WESTGATE WATER COMPANY Installation of a Water Storage Tank
and Building
Record Plan
Robert Ferri (Niclaus
Engineering) Al Furnari (Manager, Westgate Utilities)
Water company has presented their
proposal as requested by the Zoning Hearing Board. Proposed is a 24’ high by
26’ in diameter vaulted steel water storage tank with capacity for 100,000
gallons of water within a 30’ by 30’ building structure. Two sites are shown
for the location. Option 1 attaches proposed building to existing barn
structure, locating it 15’ from Lane Avenue. Ordinance requires 35’ setback.
Option 2 shows a free standing building (30’ x 30’ x 38’ high) in the rear yard
area of the lot. Tank will store treated water from four existing wells. It is
not a pressure tank. A booster pumping station will be installed within the
existing barn to provide pressure and volume of the water distribution.
Proposed tank will be a finished water storage tank with the water within being
disinfected. Existing system has a series of small tanks located within the
existing well house building. These tanks are old, some riveted, not in the
best condition, presently used as pressure storage tanks. They need to be
replaced. Another consideration is adequate storage capacity for expansion. A
development of 102 lots has requested water service. Current system has
deficient pressure and volume problems. D.E.P. requested correction of these
problems.
Responses were given to Planners inquiries.
Present tanks at 40,000 gallons cannot be replaced, as they
do not have enough volume. It would not be feasible to rehab present tanks. Two
tanks would be abandoned and the others would be cut up and removed.
Existing barn is used as a repair facility, office and
storage. Wood frame barn would not enable tank to be installed on the second
floor. Consideration should be given to the possibility of installing part of
the tank within the barn structure, increasing the distance from the property
line at Lane Avenue.
There are four wells within the well house building that are
permitted for 5 to 6 times the capacity they are presently pumping. There is
more than adequate aquifer recharge and available water.
Existing system storage is deficient in structural capacity
of tanks. There is a concern for leakage, possibly failure. Tanks are operating
as pressure tanks.
Average demand is 130,000 gallons per day. They are below
the recommended one day minimum storage capacity. Proposed tank would service
present customers as well as 102 home development. If water company would go to build out in their designated
area, they would need larger storage and a second tank at another location yet
to be determined.
This system has an interconnect
with the Bethlehem Water Company for emergency use.
Water testing is consistent with D.E.P. standards. Results
have been fine. The only treatment required has been disinfection. With the
increased detention time in proposed storage tank, there would be better
disinfection due to longer time with the disinfectant.
Tank will be replenished as demand requires. Pump station is
within the building. There would be no noise to the neighbors.
In the event of a power outage, there is a generator back up
system for the pumps.
In order to partially submerge proposed tank, subsurface
investigation would be needed to determine if excavation could be done that
deep to safely install a tank. This would be more costly. There would be
maintenance problems.
Upon reviewing letter from Hanover Engineering, dated
Courtesy of the floor --- inquiries were made by residents
--- responses by Ferri and Funari
Nick Neos of
It’s not electricity. The four pressure tanks can’t keep up.
It’s a main break within the system.
Going from a pressure system to a non-pressure system, when
the booster pump goes down, down, do we lose water right away?
Water will be in the tank and the booster pump helps
distribution.
A big horizontal tank is inside the well house that runs
parallel to
With all the piping and the layout, there physically is no
room.
Will you leave that tank or cut it up and take it out?
Probably cut it up and take it out.
This would be an alternative.
Marlene Malloy of
Presented to the company who said they would not purchase
water from another company. They do not want to rely on another source.
Can you build the storage tank closer to the 102 homes?
They do not own the land. The booster pumping facility will
be located at existing building. They want it to be as close to storage source
as possible for efficiency.
Lived here for 40 years and do not want to look at an
eyesore in a Residential area.
Len Kodnovich of
Existing pipes are sufficient.
They do not own the land.
Everyone would like to have
Well water is better than service water.
Neos - Pipes are undersized up the
hill.
Booster pump station will improve pressure and make up for
elevation.
Kodnovich - When did you put an
office in the barn?
They are putting in walls to prepare for booster pumping
station.
Jan Merkel of
It will be enclosed.
Sounds like you are trying to do it as cheaply as possible.
Looked at alternatives and they are trying to keep cost down
so customers don’t get hurt in the long run.
Malloy - What is the type of enclosure?
Same type of siding - same roof - will look like the barn.
Merkel - How long will the tanks run? Will there be noise?
No, there will be no noise. These are centrifugal pumps.
Building will be sound proof. Wells run more now than they will with a booster
pump system.
Stephen Rippert of
Barn is there now.
Karen Merkel of
Fabric fencing is part of erosion control plan used only
during the construction phase. It is temporary.
Dumpster is already there. Ordinance requires it to be
fenced.
Neos - Never got a letter
explaining rate increase. We just got the increase. Will we get another
increase after the building is built?
There is a stipulation on when another increase can be
requested.
Charles Malloy of
Since there are no curbs nor
sidewalks in this area, a waiver will be requested for S.A.L.D.O. Section
159-8.
Motion was made by Kuehne, seconded
by McGonigle, recommending waiver of S.A.L.D.O.
Section 159-8 with the inclusion of a note on the plan stipulating that
curb/sidewalk will be installed if/when required by the Board of Supervisors.
McGonigle, yes Taggart, yes Fritz,
yes Scoggin, yes Kuehne, yes
With regards to Option 1, Kuehne
suggested that water company look at the north side of the barn to enable
enclosure of part of the water storage tank so that some distance can be gained
from the property line, reducing it from 15 feet. Perhaps a bay could be remove, making overall structure smaller.
Scoggin questioned why Option 2 is
a free standing building. Scoggin discussed with Ferri the possibility of putting the enclosed water storage
tank up against the western side of existing barn. This would move it away from
the Lukens and Morgan properties. The same size storage tank building no taller
than the barn would project about 3 ˝ feet into the rear yard setback, which is
minimal compared with the Option 2 proposal. The distance from any resident would
be 20 feet. Planners requested Ferri to research the
feasibility of this suggestion after which a decision on location will be made.
GMA PARKING
Joe Landrigan (North Star
Construction) Rocco Caracciolo (Ott
Consulting)
Building construction is completed. GMA exceeded their
expectations on the number of employees they will have. 133 additional parking
spaces on the west side of the building are proposed.
Outstanding items outlined in letter from Hanover
Engineering, dated
LVCC II - LOT 4 Preliminary/Record Plan
Paul Szewczak (
Driveway out onto
Developer will have no doors extending into buffer yard.
Roof overhang adjustment will be made.
Comments were received from the Shade Tree Commission.
Waiver was requested from providing off-street loading
spaces.
Motion was made by Kuehne, seconded
by Taggart, recommending relief from providing off-street loading spaces,
Section 185-18.C.
McGonigle, yes Taggart, yes Fritz,
yes Scoggin, yes Kuehne, yes
Motion was made by Kuehne,
seconded by Scoggin, to send a letter to the Board of
Supervisors, recommending Conditional Approval, based on the satisfaction of
comments made in Hanover Engineering’s letter, dated September 7, 2004, also
comments made by the Shade Tree Commission in their letter dated September 11,
2004.
McGonigle, yes Taggart, yes Fritz,
yes Scoggin, yes Kuehne, yes
LVCC PHASE II -
Paul Szewczak (
A limited service 3-story hotel with 100 units, including an
outdoor pool, is proposed, along with a 5,525 square foot restaurant. Hotel has
been rotated so the back runs parallel to the property line. Planners favor
this repositioning.
Kuehne questioned having another
restaurant. Szewczak stated the demand is there.
Scoggin recommended creating a
dedicated driveway to insure the safety of people utilizing the hotel and/or
restaurant.
Landscaping will be offered.
Lighting will be consistent with LVCC.
VALLEY VIEW ESTATES Phase I Single-Family Detached
Residential
Preliminary/Record Plan
Keith Lawler (Keystone Consulting) Edward Murphy, Esq.
(Attorney)
Richard Gitter (DeLuca Homes)
Developer has met with the Board of Supervisors concerning
entrance signage, depth of detention pond and the possible installation of an
off-site sanitary sewer line.
Waiver requests, as outlined in letter from Keith Lawler of
Keystone Consulting, dated
Motion was made by Kuehne,
seconded by McGonigle, recommending relief of
S.A.L.D.O. Section 159-11.M(2), allowing
McGonigle, yes Taggart, yes Fritz,
yes Scoggin, yes Kuehne, yes
Motion was made by Kuehne,
seconded by McGonigle, recommending relief from Stormwater Management Section 152-10.I (6) (a), allowing
greater depth in a 10 year storm of 2.84’ (Ordinance stipulates 2.0’) and in a
100 year storm at a depth of 3.17’ (Ordinance stipulates 3.0’).
McGonigle, yes Taggart, yes Fritz,
yes Scoggin, yes Kuehne, yes
Motion was made by Kuehne,
seconded by Taggart, recommending relief from Stormwater
Management Section 152-10.H.(10), allowing bottom
slope at 1% with cable concrete low flow channels.
McGonigle, yes Taggart, yes Fritz,
yes Scoggin, yes Kuehne, yes
A waiver will be requested for S.A.L.D.O. Section 159-11.D.
Motion was made by Kuehne,
seconded by Fritz, allowing temporary cul-de-sacs to exceed allowable length of
600’.
McGonigle, yes Taggart, yes Fritz,
yes Scoggin, yes Kuehne, yes
Zoning Section 185-14.G There is
detention basin encroachment into side and rear yards. This is considered an
incidental structure. Waiver will be requested.
Upon discussion with the Supervisors on the possible
installation of an off-site sanitary sewer line, another route is being
considered which will minimize the impact of tree removal along common property
line. Sewer line would straddle the property line with easements on either side
of the line. Discussions are ongoing with the residents of 7 homes along
Planner Kuehne requested that
sidewalk be provided on the west side of
Comments were received from the Shade Tree Commission.
MOTIVATIONS TRAINING FACILITY Conditional Use Plan
Tracey Snell (
ABG Fitness, operating under Motivations Training Facility,
intends to lease 6,830 square feet of a 76,070 square foot flex building on
Operating hours are --- Monday - Thursday
Friday
Saturday
Sunday
Day care services will be offered.
45 parking spaces are required for this use. Kids Coop
requires 55 parking spaces. There are 120 total spaces for remaining five uses
in the building. With 80% warehouse and 20% office, Snell determined there are
22 remaining parking spaces.
Planners clarified that Day Care will be provided for
children of patrons who are actively exercising and only during the time the
patron is there.
Motion was made by Kuehne,
seconded by Scoggin, to send a letter to the Board of
Supervisors, recommending conditional use approval with the condition that Day
Care will be provided for children of patrons who are actively exercising and
only during the time the patron is there.
McGonigle, yes Taggart, yes Fritz,
yes Scoggin, yes Kuehne, yes
JAINDL LAND COMPANY
Scott Pidcock (Pidcock
Company) David Jaindl (Developer) Bruce Anderson (Pidcock Co.)
Pidcock updated Planners on
proposal which includes the creation of
62 acres south of
Plan reflects necessary rezoning. Legal issues are being
discussed between developer’s attorney Joseph Zator
and the Township Solicitor James Broughal.
Shade Tree Commission comments were received.
PLANNING COMMISSION
Comments regarding the Comprehensive Plan draft for the
Lehigh Valley Planning Commission are outlined in attached letter to the Board
of Supervisors.
ENGINEER’S REPORT
Schmalzer advised permit
application was received to move the poles along